These are real service changes and they warrant public input. But after working through Council’s own audited figures for 2024/25, I believe we are being invited to deliberate on the visible cents while the less visible dollars escape serious scrutiny.
The numbers that don’t appear
TCDC’s Annual Report for the year ended 30 June 2025 shows total operating expenses of $143.7 million. Once depreciation ($37.6 million) and finance costs ($4.5 million) are set aside, the controllable operating spend of around $101.7 million breaks down into two visible categories and one considerably larger invisible one.
Personnel costs were $26.4 million, covering around 248 full-time-equivalent staff. Every salary band is disclosed. Every councillor’s fee is published by name. The Chief Executive’s remuneration of $381,891 is public. This is genuine transparency and it should be commended.
The remaining $75.2 million sits in a line called “other expenses.” Within that, Note 6 of the accounts reveals: $35 million in contractor payments, $3.65 million in consultants and legal fees, and $29.6 million in “other operating expenses” — a catch-all that almost certainly includes IT, software, utilities, insurance, fleet, travel and a good deal more. These three lines together represent roughly $68 million of external spend. That is more than two and a half times the internal wage bill. And unlike the staff costs, not a single supplier is named, not a single major contract is itemised, and no annual comparison is published against the cost that identical functions would incur if delivered in-house or procured jointly with neighbours.
This is the structural issue: internal costs, which are smaller, are fully transparent. External costs, which are larger, are functionally anonymous.
Where the real savings sit
The mowing and transfer-station proposals save tens of thousands. I accept that small savings add up, and I am not arguing against service reviews in principle. But four structural areas look to me like where the larger opportunities actually lie.
Shared services across councils. In New Zealand there are 78 councils including unitary councils like AKL/ WLG, CHRC, and regional councils (like WRC), each running its own finance system, legal reviews, policy drafting, and IT. TCDC already belongs to WLASS and Co-Lab, the Waikato inter-council bodies established to pool these functions. The mechanism exists. The question is the depth of what is actually shared. Last year’s attempted Water Services Organisation with Tauranga and Western Bay of Plenty is the clearest recent example: Council’s own modelling projected savings of $500 per connection by 2034. That collapsed not because the savings weren’t real but because of inter-council politics. The opportunity has not gone away.
Procurement discipline on the major contracts. A $35 million contractor line, disclosed as a single number, invites complacency. A four-year $60 million water maintenance contract was signed with Citycare Water for commencement on 1 April 2026. Other large, long-running arrangements cover waste collection, roading, and facilities. Each deserves individual, public, year-on-year benchmarking. Ratepayers have no way at present to assess whether any of them represent good value.
Development contributions that actually reflect growth. Development and financial contributions came in at $1.87 million against a budget of $2.99 million — a $1.1 million shortfall. The 2021 Long Term Plan noted explicitly that “ratepayers have had to fund services that benefitted visitors” and agreed this was “not fair.” Five years on, the imbalance remains. Existing ratepayers continue to subsidise growth and tourism.
Capital planning and lifecycle honesty. The Thames pool exemplifies the problem: original estimate $14 million, subsequent ratepayer impact modelled at $1,100–$2,000 per household per year under some options. Delayed and under-scoped capital decisions compound into much larger bills later.
What I am asking for
Before this Annual Plan is finalised, there are three disclosures Council could make at essentially zero cost that would let ratepayers engage meaningfully with the real cost base:
1. Publish the top 20 suppliers by total spend for 2024/25, with the amount paid to each. This is routine disclosure in most central government agencies and several overseas councils.
2. Publish the consultants and legal fees line disaggregated by firm and by activity area (3 Waters, roading, planning, governance, HR, legal counsel).
3. Publish the total annual cost of TCDC’s membership of WLASS, Co-Lab, LGNZ, Taituarā and any other inter-council body, together with a short statement of the specific services received in return.
None of that is commercially sensitive. All of it is available internally. Publishing it would shift the quality of the conversation.
The bigger point
I am not arguing that Council staff or contractors are overpaid, or that the people doing this work are doing it badly. I am arguing that a democratic consultation on a maximum 3.8 percent rates rise shouldn’t have a blind spot the size of $68 million.
A recent community satisfaction survey – TCDC’s own –recorded 21 percent satisfaction with Council’s financial management. That is a striking number. Ratepayers aren’t stupid. They can tell when the conversation is being held at the wrong altitude.
Reducing services will save thousands. Improving systems can save millions, every year, compounding across Annual Plans and Long Term Plans. Mowing is not our biggest cost. We should be having the conversation that matches the scale of the numbers.