In this article I will give a reasoned argument based on fact, a relevant example and my experience as a consulting engineer and contractor on some of New Zealand’s largest Construction projects, why early consultation with all stake holders is vital for good design development and reducing life cycle operational costs.
As a consulting engineer the early design inputs of all stake holders are the very essence of good design development of any project.
The project I have chosen as my example is the 2017 design process of the Robinson Road ramp and pontoon in Whitianga.

As residents we were involved in consultation at the detailed design stage of the project. Upon getting the documents to look at, the residents then went and looked at the Cooks Beach ramp which was of a similar design and operating. We discussed the design with the ramp users at Cooks Beach and it immediately became apparent there were significant design flaws in their ramp design.
The primary issues were.
1. The combination of wind and tide on a pontoon at 90 degrees to the flow often meant that only one side of the pontoon was useable as it was too hard to land a boat due to wind and current without damaging boats.
2. The pontoon and ramp areas at 90 degrees would be subject to the collection of slash and silt requiring dredging and clearing maintenance on a regular basis.
3. The design of the head of the ramp should be well thought through for health and safety reasons and to prevent congestion.
We then asked the boaties how they would correct these items. They said the following:- Design the ramp and pontoon at 30 degrees to the shore so that the slash dredging and wind issues are mitigated as much as possible. Then design the staging area to allow straight reversing of the trailer to the pontoon.
Armed with this information, we went back to Council and discussed these issues. We were told the design was done and only minor alterations could be accommodated because there was no money left in the budget for any redesign at this stage of the project.
Given that the capital cost of building the ramp is 20 % maximum of its total life cost and 80% of the life cost is operational, it would have been better to redesign the ramp at Robinson Road to make it more efficient and cost effective to rate payers over the life of the ramp. This is justified due to significant maintenance being required on the pontoon with damaged plastic sections from heavy wear and tear and slash, and accidental crashing of boats due to wind and tide.
Dredging has also been carried out to keep it clear of silt build up where as a 30-degree pontoon would be self-clearing of the majority of slash and silt build up.
There are also significant issues at the existing ramp regarding flow of traffic, turning circles and health and safety that we documented and were never actioned.
The design of the staging area is flawed in a number of areas and causes congestion.
There is no protected pedestrian path from the staging area to the pontoon meaning pedestrians have to take their chances amongst drivers backing their boats to get to the pontoon. For the elderly and young children this is a nightmare and we have witnessed many close calls.
There are cars parked at the estuary side of the staging area. This has the effect of blocking the line of site to the pontoon for drivers trying to figure out if it’s their turn to use the ramp. Our solution was to shift the staging area to the seaward side so this would be in full view for drivers. This was also not implemented and causes great frustration, congestion and aggression in the busy periods at the ramp.
The Staging area has entry and exit from both sides of the road causing congestion and confusion especially to visitors in the busy season.
Current Council Project – design questioned
The new conceptual plan included in this article for Robinson Road boat ramp and Hilton Park includes a jetty and small pontoon. The idea of the jetty gangway and pontoon is to provide an option for recreational trailer boaties to have passenger drop off and short term berthage while parking or retrieving their trailer or waiting to use the ramp in busy periods. This will also shorten the walking distance if they have elected to park further away without congesting the boat ramp.
I contend that nine times out of ten, skippers of trailer boats are also those skilled at backing boat trailers and they will be at the ramp and have to walk to Hilton Park to retrieve the boat trailer so I doubt if the jetty and pontoon will achieve its intended purpose of reducing congestion.
The second idea is to extend the existing pontoon towards the channel so more boats can berth there and possibly add another ramp and pontoon to the existing ramp.
I question this design as the congestion points are not the number of ramps or pontoon space required but the design of the head of the ramp staging area and narrow roads leading up to it. In my opinion until this infrastructure is fixed, putting in additional pontoons at the Robinson Road ramp is a complete waste of ratepayer’s money.
This design also brings the pontoon very close to the main channel which exposes it to more wake from the larger boats travelling to and from the Waterways. The safety of such a design also needs to be taken into account as any congestion in this area will spill over to the main channel.
The last planned change is to use Hilton Park for boat trailer parking. Those of us who regularly walk across Hilton Park know that after a couple of showers of rain, it’s like a sponge and heavy Utes towing trailers will cut it up in no time. Also, it’s not as underutilised as the council would have us believe. The residents who back on to the park use it for recreational purposes with their children and grandchildren. It’s also a safe walking area for children going to school as it reduces the number of road crossings they have to negotiate.
We note that the proposed trailer boat exit from the park is adjacent to a narrow partially obscured corner and suggest this will be a safety issue for ute and trailer boats of up to 12 metres long.
To conclude, in my experience as a consulting engineer the best designs emanate from having all the stakeholders fully engaged in the process from the beginning of the project. This in my view produces designs that endure and minimises long term maintenance costs. The example presented clearly demonstrates this. Whether 30 degrees is the right angle for the pontoon or not we will never know, as there was no chance to model it and find out.
Note: The minutes of that last meeting had with council in 2017 support the above information as well as identify further health and safety issues that have never been addressed. However, due to space issues The Informer could not include the minutes, but they are available on our website adjacent to this article.
Meeting Minutes
Robinson Road Boat Ramp Upgrade
Meeting held on site, Monday 13 March 2017and subsequent resident meeting to discuss the issues on Monday 21st of March
Attending: Stephen Bremner (TCDC),
Michael Brown (Resident 61 Robinson Road),
Craig Hill (Resident 65 Robinson Road)
Resident meeting attendees: (Roger Booth 90 Catherine crescent) Ross and (Mary Walker 59 Robinson road )Mike Brown ,CraigHill,Tony Turner 88 Catherine Crescent.All residents were boat owners and used the Robinson road ramp .
- Introductions:
Note: All residents agreed with the concept of upgrading the ramp and ramp staging area and the additional issues identified are based on practicality from experience of using the ramp and safety concerns
- Looked over proposed new boat ramp layout on Tonkin and Taylor plans 851923 Rev 2.
- Discussed various parts of the new boat ramp layout and the following comments were made regarding the existing and new boat ramp layout.
- There is a lot of traffic on Robinson Road during the peak of summer and both Craig and Michael have witnessed near miss accidents between existing ramp users due to the corner adjacent to the ramp, the narrow road and road traffic the main issues arising from conflict and congestion between, boat ramp users parked waiting to use the boat ramp, cars parked reading the information board outside the old stone store,cars parked with families having picnics at the small beach area near the ramp ,ramp users preforming U-turns across the road to enter the staging area in the correct direction, ramp users backing directly from the road rather than the boat staging area and foot traffic eg dog walkers and tourists taking photographs of the estuary.
Sun strike in the early morning and late afternoon also adds to the traffic hazard at the ramp.
- Suggested improvements for the existing and new boat ramp layouts;
- Addition of no parking lines outside old stone store,
- No Parking lines opposite the boat ramp are extended for the whole block Arthur to Watt Streets.
- No parking signs erected to enforce no parking
- Some form of boat ramp ahead signage
- No boat trailer parking east of the stone store to allow other users an area to park for, launching Kayaks, taking photos, looking a stone store
- Traffic calming measures on eastern approach to boat ramp (slow traffic)
- Craig and Michael where both concerned at the size of the new boat ramp and the potential of having 4 lanes of boat ramp users trying to launch at the same time and the traffic/congestion issues this would cause. Craig and Michael both indicated that they would prefer the boat ramp is limited to two lanes only in keeping with the residential street environment. They indicated that if the new boat ramp design was built over the existing boat ramp i.e. kept to two lanes, that they would both support the project.
- Addition of Pontoon. Craig and Michael did not support the addition of a pontoon with the following reasons:
- The current is too strong for a pontoon making use of the pontoon impractical • The current plus wind will have the effect of limiting usage on any pontoon to a single lane • There is a lot of debris in this area of the harbour that will become caught in the pontoon especially during periods of high rainfall
- There is too much wash from launches travelling to and from the Waterways because of proximity of the pontoon to the channel.
- We have observed the issues of the new ramp and pontoon at Cooks beach eg: only one side in use ,difficulties in berthing due to wind and current causing damage to the boats. Robinson road is more exposed than Cooks beach so the likely outcome would be similar if not worse.
- 7. Staging area. The new pontoon layout does not show a staging area? Where are the boats going to stage to launch? Any new staging area would extend too far along the road in front of the houses. Limit too much boat trailer parking.
In addition we recommend that the existing Staging area for boats should be doubled in size to reduce the traffic backing across the road. The money allocated for the pontoon could be used to achieve this which would alleviate many of the safety concerns. see attached sketch plan.
8 The residents meeting agreed that the reasons the existing ramp is not used by larger boats currently are :
- The combination of current ,wind and wake from boats using the channel make it difficult to launch and retrieve from the ramp .
- The closeness to the channel of the ramp when launching and retrieving is potentially dangerous in busy periods due to vessels waiting between the channel and the ramp to use the ramp .
- Most local larger boat owners can afford to pay the fee at the marina to launch their boats in a sheltered ramp area.
- The staging area is too small meaning to launch down the ramp creates a traffic hazard . • The meetings opinion based on experience was that the ramp even in an upgraded form would only be suitable for boats up to maximum 7 metres in length for the above reasons. It was noted that the majority of boats using the ramp currently are between 3 and 5.5 metres.
Editor’s Note: I suggest readers turn to Letters to the Editor for TCDC’s response to the letter written by Mike Brown and Dr Jane Buckley 3 September on this matter. Dean Allen District Manager TCDC, explains their process for the Esplanade Development Pre-concept stage.